Home Projects Office Complex and IT Lab
IT lab
Projects

Customer:

Global high tech company developing virtualization software

IT lab

Project:

TriTech acted as main systems contractor for the construction of an office complex and a 300 m² IT lab and provided a turn-key solution.

Scope of work:

  • Power supply
    • Electricity board in main offices 250A; IT lab: 160A 60kva UPS
    • Power distribution system
    • Lighting system
  • Environment control integrated in electric board, for following functions:
    • Temperature and humidity control
    • Flooding detector
    • Door control
    • Control of UPS and electric board
    • Smart air condition management
    • Measurement of current at rack level
    • Fault reporting by SMS alerts
    • Management system
  • Data center
    • Racks for IT lab, servers and communication
    • PDU's
    • Cable management
    • Hot aisle containment
  • Air Conditioning
    • IT lab: redundant cooling system
    • Upgrade of air conditioning in office complex
  • Fire detection and extinction
    • Lab: installation of Pre Action system
    • Offices: installation of sprinkler system
    • Installation of fire detection system and control panel
  • Communication
    • Installation of fiber optic cables linking communication centers
    • Installation of copper cables to some hundred ports